Annual Street Maintenance

Posted

In place of a traditional crack fill/seal coat project on City streets, the City Council approved a new method called RECLAMITE. Reclamite is a preservation treatment for asphalt restoration and preservation. Reclamite replenishes the oil that exists in asphalt when it’s first poured but oxidized over time. Applying Reclamite extends a residential road’s life by 5-10 years. It also reduces permeability, which prevents water and air from entering the asphalt and causing cracks.

The project is scheduled to begin on August 19 and the contractor will be posting No Parking signs on affected streets a day or two in advance.

Local Dundas streets receiving Reclamite have not been seal-coated.

Included in the 2025 project are the following streets:

Forest Ave

Depot St

Hester St

Bridgewater Parkway

Tower Ave

Cedar Lane

Bluff St

Cross Circle

Highland Parkway